APPROX. 45,000 ENGINEERING MAN HOURS AND 980,000 SITE MAN HOURS.
CONSTRUCTION AND PRE-COMMISSIONING OF API5L TRUNK LINE OF CRUDE OIL , 18”, INCH FLOW LINE 8”.
CONSTRUCTION AND PRE-COMMISSIONING OF PIPE LINE OF HDPE FOR RIVER WATER HAVING DIAMETER 4” AND 2”.
CIVIL WORKS FOR EQUIPMENT FOUNDATIONS, DRAIN CHANNEL AND PIT.
EQUIPMENT INSTALLATION INCLUDING PIG LAUNCHER, PIG RECEIVER, DOSING PACKAGES, ELECTRICAL EQUIPMENT
CONSTRUCTION AND PRE-COMMISSIONING OF API5L TRUNK LINE OF CRUDE OIL , 18”, INCH FLOW LINE 8”.