REHABILITATION of BAGHDAD POTABLE WATER DISTRIBUTION SYSTEM
PROJECT DESCRIPTION
Company(Client):
Parsons
ATCO Role:
Sub Contractor
Total Project Value (USD):
7,000,000
Type Of Work:
Civil/ mechanical / piping
Start Date:
3 Dec, 2004
Completion Date:
16 Nov, 2005
Estimated Man-hours Consumed:
461,240
Description:

ATCO Performed investigations and Surveys. Coordinated Security in Sadr City an extremely high Security area. Supplied and Installed the water distribution network including excavation. dewatering. shoring, compacting and leveling the natural earth. Also padding the ditch with a base Layer of sand, installing pipes and connections.  backfilling with sand soil and mixed aggregate sub base. Paved the road with 10 cm thick by using Concrete asphalt pavement. We participated successfully as a subcontractor to parsons and performed all of the work specified on this project except detailed design. See the attached Certificate of Appreciation from Parsons for our Successful Completion of this project while maintaining a high standards of quality, security and safety.



DOWNLOAD ATCO PROFILE
Copyright © 2015 ATCO | All Rights Reserved. | Powered by Xotox Branding Agency
Al-Tafaweq Co. for General Contracts, ltd.