- Tie-in for 24 Wellheads
- New development and Tie-in for 25 Wellheads
- Piping estimated dia inch 37000
- API 5L Pipe line 24” 4.8 km and 18” 2.2 km
- HDD for 24 Pipeline 01 nos
- 02 Substation and 02 Control Room Buildings
- 02 Substation and 02 Control Room Buildings
- Installation of MPFM s, WHCP,s Closed Drain Drums
- Installation of HIPSP, Honeywell Control System, UPS, FOC, Switchgears